Skip to content
Built Different

Accountable Construction

Every mile of fiber is installed new, underground, with precision craftsmanship and genuine respect for the properties and people we are building for. Here is what that process looks like. 

Our Construction Process

A proven five-step process on every build, designed to protect your property, minimize disruption, and deliver infrastructure built to last for decades. 

1
Locate Underground Utilities

All existing underground utilities are precisely located and clearly marked before a single shovel touches the ground.

2
Prepare the Ground

Trenches are carefully excavated to the proper depth for burying protective conduit and fiber optic cable.

3
Install Cable and Equipment

Fiber optic cables are installed through underground conduit, and connection boxes are positioned at designated customer access points.

4
Restore Your Property

All disturbed areas are fully restored, grass reseeded, driveways repaired, and your property returned to the condition we found it before we move on.

5
Connect Your Home or Business

Final connections run from the street to your address, with end-to-end testing completed at every component before your service goes live.

What to Expect During Construction

While our crews work to minimize disruption, underground fiber construction may temporarily affect your neighborhood.

Little-Miami-Gig-Ohio-construction_roads-1
Temporary Markings You may notice colored flags or spray paint marking utility locations on your property or in common areas.  
Equipment and Access

Our crews may need temporary access to sidewalks, driveways, or lawns. Heavy equipment may cause noise and dust during operation.

Traffic Changes Temporary parking restrictions or traffic pattern changes may be in place while we work in your area.
Property Restoration We carefully restore any impacted areas. All disturbed grass, landscaping, and surfaces will be returned to their original condition.

A Note on Safety

Please maintain a safe distance from equipment and active construction zones, and supervise children and pets near any work areas. Heavy machinery may remain onsite overnight, so stay aware of equipment during any temporary traffic pattern changes. 

Have Questions or Concerns?

Subscribe to Chagrin Valley Gig Internet

Access dedicated gigabit speeds on a locally built underground network.